Quick answer

What triggers each payment?

A named construction stage of your wing, for example completion of foundation or of the 10th floor slab. Payment letters are raised block by block, so check progress on your own tower before paying.

Early stages: excavation to basement

  • Mass excavation (10%). The pit for the wing’s basements is dug to design depth. This is the first construction milestone after the Agreement to Sale.
  • Foundation (6%). The raft or footing that carries the wing is complete.
  • Basement 2 roof slab (6%). The towers have two basement levels (2B), so this is the slab above the lower one.

Floor slabs: the long middle

From the 2nd floor slab to the 30th floor slab, payments are tied to slab completion at the 2nd, 6th, 10th, 15th, 20th, 25th and 30th floors. Slab completion means the concrete slab of that floor is cast, not that the floor is finished inside.

Tower A is 2B+G+36 and Towers B and C are 2B+G+32. The sample sheets are for Tower C; ask which slab milestones apply to your tower.

Finishing stages

  • Terrace slab (5%). The top slab of the tower is cast.
  • Internal flooring (5%). Flooring inside your apartment is complete. The sheet excludes laminated wooden flooring and common areas.
  • First coat of internal paint (5%). Inside walls have the first coat.
  • Intimation of possession (5%). Assetz notifies you that the apartment is ready to hand over.

How to verify before you pay

  1. Ask for the milestone certificate or site photographs for your wing, not the project as a whole.
  2. Visit the site, or have someone inspect it. SNAP Realty can arrange visits.
  3. Compare the demand letter with the milestone in your cost sheet.
  4. Check the project’s quarterly progress updates on the Karnataka RERA portal once the project is registered. See how to track progress.

Frequently asked questions

Can I pay a milestone early?

You can, but there is no reason to. Interest cost on your money or loan starts earlier and you gain nothing.

What if a milestone is delayed?

The payment is due only when the milestone is reached, so a delayed milestone delays the demand. Delay in the final handover has separate remedies under RERA once the project is registered.

Talk to SNAP Realty about Assetz Codename Sublime

Ask for the current cost sheet, the latest availability and a site-visit slot. We answer on WhatsApp the same day.

Register Your Interest

Takes 15 seconds. Our team calls back within the day.

Zero spam calls.

By submitting, you agree to be contacted by SNAP Realty about Assetz Codename Sublime.

Call NowWhatsApp