Assetz Codename Sublime Price
Sample cost sheet: 3 BHK, Tower C, floor 8 (C088)
The same 1,945 sq ft 3 BHK on a lower floor, priced ₹1,00,000 higher than the floor 10 unit. The line items show why.
Register Your Interest
Takes 15 seconds. Our team calls back within the day.
Zero spam calls.
Quick answer
How much is a 3 BHK on floor 8 of Tower C?
₹1,99,00,000 on the sheet dated 11 February 2026 for unit C088 (1,945 sq ft super built-up, 1,195 sq ft carpet), including one covered car park, GST, 24 months of maintenance and the sinking fund. Stamp duty and registration are extra.
The unit
| Detail | Value |
|---|---|
| Apartment | C088 |
| Tower | C |
| Type | 3 BHK, 3 toilets |
| Floor | 8 |
| Super built-up area | 1,945 sq ft |
| Carpet area (RERA definition) | 1,195 sq ft |
A. Base price
| Line | Amount |
|---|---|
| Base rate ₹7,861 + floor-rise ₹240 = ₹8,101 per sq ft | ₹1,57,55,592 |
| Car parking slot (one covered) | ₹3,50,000 |
| Clubhouse charges | ₹3,50,000 |
| Infrastructure charges (power, water, generator, STP and similar) | ₹18,47,750 |
| Total base price (A), excluding GST | ₹1,83,03,342 |
B. GST on the base price
| Line | Amount |
|---|---|
| Less abatement (one-third of total base value) | ₹61,01,114 |
| Taxable value after abatement | ₹1,22,02,228 |
| CGST at 3.75% | ₹4,57,584 |
| SGST at 3.75% | ₹4,57,584 |
| GST on total base price (B) | ₹9,15,167 |
C. Other charges and the total
Other charges are identical to the floor 10 sheet: ₹75,000 legal and documentation, ₹4,20,120 for 24 months of maintenance, ₹97,250 sinking fund, plus 18% GST on legal and maintenance. They total ₹6,81,492 (C).
Total price (A + B + C): ₹1,99,00,000. On super built-up area that is about ₹10,231 per sq ft all-in.
How it compares with floor 10
| Floor 8 (C088) | Floor 10 (C105) | Difference | |
|---|---|---|---|
| Base rate per sq ft | ₹7,861 | ₹7,752 | ₹109 higher on floor 8 |
| Floor-rise per sq ft | ₹240 | ₹300 | ₹60 lower on floor 8 |
| Total price | ₹1,99,00,000 | ₹1,98,00,000 | ₹1,00,000 higher on floor 8 |
The sheets do not say why the base rate differs. See why same-size flats differ in price.
Frequently asked questions
Why does a lower floor cost more here?
On these two sheets the floor 8 base rate is ₹109 per sq ft higher, which more than offsets the ₹60 lower floor-rise. The sheets give no reason. Position, facing and the offer applied are common reasons, but ask Assetz which applies.
Does floor 8 or floor 10 pay more floor-rise?
Floor 10 pays ₹300 per sq ft and floor 8 pays ₹240, which matches ₹30 per sq ft for each floor of height on these two sheets.
Talk to SNAP Realty about Assetz Codename Sublime
Ask for the current cost sheet, the latest availability and a site-visit slot. We answer on WhatsApp the same day.
Register Your Interest
Takes 15 seconds. Our team calls back within the day.
Zero spam calls.
