The Peripheral Ring Road: planned, not yet built
A different and earlier-stage project than the STRR. It should not be counted as part of today’s connectivity.
Register Your Interest
Takes 15 seconds. Our team calls back within the day.
Zero spam calls.
Quick answer
Is the Peripheral Ring Road built?
No. It is a planned roughly 73 to 74 km, eight-lane expressway between Tumkur Road and Hosur Road via the Old Madras Road and Hoskote Road. As of May 2026 construction on the first stretch was expected within two to three months of that report.
What is planned
An inner ring road, closer to the city than the STRR, connecting several arterial roads including the Old Madras Road and Hoskote Road. It is also known as the Bengaluru Business Corridor.
How to treat it
Treat it as planned, not underway. Large road projects in Bengaluru have slipped repeatedly. Do not pay a premium for a road that does not exist yet.
Frequently asked questions
When will it open?
No confirmed date is available to us.
Continue reading
Talk to SNAP Realty about Assetz Codename Sublime
Ask for the current cost sheet, the latest availability and a site-visit slot. We answer on WhatsApp the same day.
Register Your Interest
Takes 15 seconds. Our team calls back within the day.
Zero spam calls.